Mayflower Detox

2022-06-20T09:37:13-04:00

Location: Wilmington, MA - 362 Middlesex Ave New, ground-up, design-build construction of $8.2 million dollar, state of the art, 22,000 square foot, 48-bed rehabilitation facility.This project, completed in 11 months, features high-end, interior finishes, a cafeteria, lobby, in-take office, professional offices, nurses station, exam & patient rooms, work-out room, several common areas and DEA regulated [...]

ColdSnap

2022-06-18T20:46:38-04:00

Location: Billerica, MA  This two phase, $5 million dollar, 23,000 square foot addition to ColdSnap's existing mixed-use facility was brought in on-time and within budget. This addition, completed in 9 months, included renovating office space and increased manufacturing capacity of ice cream machines and pods allowing ColdSnap to come to market faster, and accomplish their [...]

NE Orthodontic Labs Addition

2016-10-12T17:50:00-04:00

Location: Wilmington, MA When New England Orthodontic Laboratories needed an "expander" of their own, they called on Channel to design and build their new 5,100sf addition to welcome their highly innovative, leading-edge 3D modeling equipment and digital departments.  Commencing construction during winter conditions, exterior highlights involved extensive sitework to provide additional parking and new storm [...]

Roof Collapse Re-construction

2022-06-19T21:29:22-04:00

Location: Hingham, MA The roof of this metal building in Hingham buckled under the excessive snow loads during 2015's harsh winter.  As a Varco-Pruden metal building design-builder, Channel was quickly deployed to safeguard the building for public safety and to reduce any further damage to the structure.  Shortly thereafter, Channel's design team was engaged to [...]

206 Ballardvale Street

2022-06-18T21:04:46-04:00

Location: Wilmington, MA  This 14,000sf retail building was a well needed addition to the busy Ballardvale Street business district of Wilmington.  Channel was tasked with creating the overall design, site layout and construction of this multi-tenant retail facility that not only had to aesthetically compliment the surrounding businesses, but needed to be completed within a [...]

State Motors

2015-06-23T16:43:21-04:00

Location: Manchester, NH Channel seamlessly collaborated with the Grant Family to modernize their 1960’s era Lincoln dealership into an innovative, state-of-the-art facility that included energy saving LED lighting and ultra-efficient HVAC systems.  Designed and built to meet Fordland’s specifications while enduring one of New England’s toughest winters on record, Channel proudly minimized business disruption using [...]

Phillips Academy Andover

2015-06-04T08:37:59-04:00

Location: Andover, MA In addition to a variety of renovations and upgrades to their historic buildings, in 2012 Channel Building was the first contractor to perform a design-build project at Phillips Academy Andover.  Phillips has engaged Channel Building to renovate student dormitories and faculty resident spaces including upgrading life safety systems, updating finishes and replacement [...]