Location: Wilmington, MA This 14,000sf retail building was a well needed addition to the busy Ballardvale Street business district of Wilmington. Channel was tasked with creating the overall design, site layout and construction of this multi-tenant retail facility that not only had to aesthetically compliment the surrounding businesses, but needed to be completed within a [...]
Lowell Five Cent Savings Bank
Amy Brodbine2015-07-21T10:13:28-04:00Location: Lowell, MA With the site, utilities and foundation in place, Channel seamlessly transitioned into this project in close collaboration with the Lowell Five Cent Savings Bank’s architect, DRL Associates, Inc., and their consulting team, NES Group, which proved to be as rewarding as the impact the new 5,500 sf ground-up Lowell branch location has [...]
275 Salem Street
Amy Brodbine2015-06-01T17:50:40-04:00Location: Woburn, MA Channel was engaged to design and build this 10,500 sf ground-up, block building nestled on a busy street in Woburn, MA. From the start, both Channel and the owner partnered to overcome site conditions while reworking the original design for a multi-tenant industrial facility to suit a single tenant occupant. Channel deftly [...]
Bill DeLuca Haverhill Dealerships
kmcg12014-10-05T09:52:29-04:00Location: Haverhill, MA Channel built the first building of this 3-building auto mall housing the Chrysler-Jeep car line. In 2001, this project earned Channel the prestigious Varco-Pruden National Hall of Fame award “In Recognition of Excellent Craftsmanship and Construction” in the auto dealership category.
Dunkin Donuts Wilmington
kmcg12014-10-05T10:02:37-04:00Location: Wilmington MA This 3,600 square foot building, was split to have Dunkin’ Donuts occupy 1,900 square feet for their eat-in restaurant and canopied drive-through located on the north side of the building. While the remaining 1,400 square feet is built for a future office or retail tenant. Channel Building partnered with Ganek Architects, Inc. [...]
Land Rover of Sudbury
kmcg12014-10-05T18:49:20-04:00Location: The Freelander earns a spot on Automobile Magazine's All-Star list the same year Channel Building completed construction of this design-build venture. Built within Land Rover’s high design standards, this project met all building expectations and the 6 month build timeframe.