Location: Billerica, MA This two phase, $5 million dollar, 23,000 square foot addition to ColdSnap's existing mixed-use facility was brought in on-time and within budget. This addition, completed in 9 months, included renovating office space and increased manufacturing capacity of ice cream machines and pods allowing ColdSnap to come to market faster, and accomplish their [...]
Roof Collapse Re-construction
Amy Brodbine2022-06-19T21:29:22-04:00Location: Hingham, MA The roof of this metal building in Hingham buckled under the excessive snow loads during 2015's harsh winter. As a Varco-Pruden metal building design-builder, Channel was quickly deployed to safeguard the building for public safety and to reduce any further damage to the structure. Shortly thereafter, Channel's design team was engaged to [...]
Merrimack College Hockey Locker Rooms
Amy Brodbine2016-03-10T22:55:39-05:00Location: North Andover, MA This project consisted of a complete gut and renovation to both Women’s and Men’s Locker room facilities. The women's ice hockey team received a brand-new locker room, in addition to a team lounge and dining area, bathrooms, coaches' offices and various other amenities servicing the sports medicine, strength and conditioning and [...]
State Motors
Amy Brodbine2015-06-23T16:43:21-04:00Location: Manchester, NH Channel seamlessly collaborated with the Grant Family to modernize their 1960’s era Lincoln dealership into an innovative, state-of-the-art facility that included energy saving LED lighting and ultra-efficient HVAC systems. Designed and built to meet Fordland’s specifications while enduring one of New England’s toughest winters on record, Channel proudly minimized business disruption using [...]
Phillips Academy Andover
kmcg12015-06-04T08:37:59-04:00Location: Andover, MA In addition to a variety of renovations and upgrades to their historic buildings, in 2012 Channel Building was the first contractor to perform a design-build project at Phillips Academy Andover. Phillips has engaged Channel Building to renovate student dormitories and faculty resident spaces including upgrading life safety systems, updating finishes and replacement [...]
Christ Church Andover
kmcg12014-10-05T09:50:01-04:00Location: Andover, MA This design-build renovation of an original HH Richardson designed building consisted of designing and building the nave balcony to accept a new Opus 137 organ, that was manufactured by C.B. Fisk Company of Gloucester, along with major floor and ceiling acoustical improvements and HVAC requirements needed to support the new organ.
One Main Street
kmcg12014-10-05T10:01:15-04:00Location: Andover, MA This design-build project in Elm Square at the corner of Main and Central Streets was a major renovation of the existing 100+ year old, 10,200 square foot structure. A 4,800 square foot third story was also added along with major structural and aesthetic exterior enhancements. The design challenge was to create a [...]
North Andover Country Club
kmcg12014-10-05T18:50:52-04:00Location: North Andover, MA After a devastating fire ravaged the clubhouse, Channel Building collaborated with committee members to construct a replica of the antique wood framed structure. The building houses a full-service restaurant and lounge, pro shop, game and locker rooms and a modern kitchen.
Chunky’s Cinema Pub
kmcg12014-10-05T18:51:43-04:00Location: Nashua, NH Originally an Ames department store, this design-build renovation project consists of a 1000 seat, 8-cinema theatre, with unique dining and arcade areas. The high-tech mezzanine projection room was designed to fit the original building layout. With our design-build development, this project met the client’s tight time schedule.
Salemhaven Nursing Home
kmcg12014-10-05T18:54:14-04:00Location: Salem, MA This major renovation created a clean new interior that included resident rooms, nurse’s stations, visiting rooms and common area, as well as a new atrium entranceway and landscaping. Channel worked with Hastings & Hoffman Interiors to complete the project on time and within budget.