Location: Andover, MA This design-build renovation of an original HH Richardson designed building consisted of designing and building the nave balcony to accept a new Opus 137 organ, that was manufactured by C.B. Fisk Company of Gloucester, along with major floor and ceiling acoustical improvements and HVAC requirements needed to support the new organ.
One Main Street
kmcg12014-10-05T10:01:15-04:00Location: Andover, MA This design-build project in Elm Square at the corner of Main and Central Streets was a major renovation of the existing 100+ year old, 10,200 square foot structure. A 4,800 square foot third story was also added along with major structural and aesthetic exterior enhancements. The design challenge was to create a [...]
Bell Circle Plaza
kmcg12014-10-05T18:37:00-04:00Location: Revere, MA This new 50,600 square foot multi-building retail center design-build renovation project, includes four retail buildings, with two of the buildings having lower level store fronts. There are 23 tenant spaces ranging from 1,200 square feet to 13,000 square feet. The project involved total demolition of three existing buildings, redeveloping of retail and [...]
Bank of New England Headquarters
kmcg12014-10-05T18:47:43-04:00Location: Salem, NH This Bank of New England 4-story headquarters building was planned by our design group headed by Greg Weich and set the standard for the design of the bank’s numerous branches. Bank of New England is one of the fastest growing banks in New England.
Germanium Power
kmcg12014-10-05T18:48:33-04:00Location: Salem, NH Germanium Power offers high speed and large area photodetectors for radiation detection and telecommunication applications. Their requirements were high tech processing equipment for use in laboratories
Land Rover of Sudbury
kmcg12014-10-05T18:49:20-04:00Location: The Freelander earns a spot on Automobile Magazine's All-Star list the same year Channel Building completed construction of this design-build venture. Built within Land Rover’s high design standards, this project met all building expectations and the 6 month build timeframe.
Chunky’s Cinema Pub
kmcg12014-10-05T18:51:43-04:00Location: Nashua, NH Originally an Ames department store, this design-build renovation project consists of a 1000 seat, 8-cinema theatre, with unique dining and arcade areas. The high-tech mezzanine projection room was designed to fit the original building layout. With our design-build development, this project met the client’s tight time schedule.